# Network change validation checklist

Adapt this NetPrompt AI reference checklist to your devices and change process.
Guide: https://netprompt.ai/resources/network-change-validation-checklist

## Scope and ownership
- Change ID, objective, owner and approver:
- Target devices, models, OS versions and contexts:
- Affected services and dependencies:
- Maintenance window and timezone:
- Communication contacts:

## Before
- [ ] Define measurable success and conditions that must remain unchanged.
- [ ] Capture timestamped configuration and operational evidence.
- [ ] Run representative application tests from relevant source locations.
- [ ] Validate inputs and commands using applicable vendor documentation.
- [ ] Confirm permissions, authorized management access and recovery access.
- [ ] Prepare and review the platform-specific recovery method.
- [ ] Define stop conditions and the recovery decision owner.
- [ ] Obtain approval for the actual execution sequence.

## Validation matrix
| Check | Baseline evidence | Expected change | Post-change result | Pass/fail/unknown |
| --- | --- | --- | --- | --- |
| Management access | | | | |
| Interfaces / adjacencies / routes | | | | |
| Application transaction | | | | |
| Permitted and denied flows | | | | |
| Monitoring / health | | | | |

## During
- [ ] Record actual commands, targets, timestamps and results.
- [ ] Stop on defined failure or ambiguity; record the state reached.
- [ ] Escalate scope changes for review before continuing.

## After
- [ ] Repeat baseline checks under comparable conditions.
- [ ] Verify application behavior, not only configuration syntax.
- [ ] Review unexpected differences and new alerts.
- [ ] Observe for the agreed period.
- [ ] Record accept / recover / investigate decision and owner.
- [ ] If recovery is needed, verify service afterward.
- [ ] Attach evidence, approvals and final outcome to the change record.

This checklist does not implement automatic rollback or predict every possible network impact.